This guide is free, and it stays free. Use it to compare ideas, size a build for your own setup and see what the parts really cost. Other builders' setups are on community builds, current part prices are on the parts list, and other people's winches and tow boogies are on related DIY builds. It follows my own build from the bench to first rides, and I add to it as each step works. Chapters marked "coming" are waiting on the prototype.

Not a certified tow system. You build it, you're responsible for it. Nothing here has carried a rider yet.

1. What it is

System 6.9 is an endless rope loop strung between two low A-frames on a shoreline. One motor on the drive end turns a capstan. The loop moves, and a carrier on the loop pulls the rider. Reverse the motor and the rider goes the other way.

It is meant for foil and skim at a tow height of about 0.8 to 1.5 m, over a span of roughly 80 to 150 m. It is not a cable park, a one-way winch, or a wake tower (see how a DIY endless tow compares). The parts budget I'm working to is about $1,750 to $5,000.

2. Safety first

3. How it works

The drive shore has everything powered: the battery, the motor controller, the motor and the capstan. The return shore has only an idler pulley on a sliding carriage and the parts that keep the loop tight.

Torque goes from the battery to the controller, the motor shaft, a key, the hub and the capstan drum. The rope wraps the drum several times, and that grip moves the whole loop. A key carries the torque. Set screws and lock nuts only stop parts sliding along the shaft.

Keeping the loop tight

PartJob
2 extension springsWorking tension. They take up slack as the line stretches.
2 heavy ratchet strapsBackup if a spring fails. Not the main tension.
Hard stopsThe last limit on how far the carriage can slide.

Use extension springs that pull. Torsion springs from a garage door are the wrong part.

4. Build order and test ladder

Each step has a pass check. Don't start the next step until the last one passes.

  1. Bench grip test. Key the drum to the motor, wrap 3 or 4 turns of rope, and pull hard against a fixed anchor such as a truck. It passes when the line moves under load without slipping or polishing the drum, and the E-stop kills the pack.
  2. Empty shuttle. Set both A-frames, reeve the loop, set the springs, straps and stops, and run it with no rider in both directions. It passes when it reverses cleanly, the rope doesn't jump, and the tension holds.
  3. Foil speed. Add the carrier, a short tow and a handle. Ride at about 12 to 18 km/h only, with a spotter on the E-stop.
  4. Skim speed. Only after foil runs are boring: about 25 to 35 km/h.

5. Drive end: the capstan housing

My bench rig is a Portable Winch PCA-1100 capstan drum on a 25 mm shaft, held by two UCP205 pillow blocks on a plywood base. This is the current draft. Every number comes from catalog data, so measure your own parts with calipers before you drill.

Cut list (19 mm plywood)

PartQtySize (mm)
Base1220 × 500
Riser pad layers (glue 3 per stack)650 × 180
Thrust cleats250 × 38
Fairlead upright layers2200 × 230
Gussets (right triangles)2150 × 150

That's about 0.15 m², so half of a 2 × 4 ft panel is enough.

Key numbers

Measure before you drill

Clamp the base to the bench with the drive end at the edge, because the rope pulls the whole rig toward the far pulley. For first spins, use a drill with a 1/2 in square adapter, which is gentler on a printed shaft than an impact wrench.

6. Motor to capstan

The shaft takes a standard 8 × 7 key. Add a set screw over the key and medium threadlocker. Put the drive sprocket or coupling right next to a bearing.

7. Line and loop length

The plan is an endless loop of about 3 mm Dyneema. Measure the span between the two A-frames on site, then order rope for 2 × span, plus the wraps on the drum, plus the splice. For a 100 m span that's over 200 m of line.

8. Parts

The hardware on my bench right now, with links, is on the parts page.

9. Coming next

These chapters arrive as I build and test them: motor and battery sizing, the E-stop and contactor wiring diagram, A-frames and the return carriage, and results from the empty shuttle and first rides.

Get each new chapter

Join the list and I'll email when a chapter lands. Free, and only about System 6.9.

Join the list

Not a certified tow system. You build it, you're responsible for it. Use at your own risk.